
Add to Cart
Hot Rolled H Steel Long Steel Lifetime Light Stell Prefab House Can Be Any Color:
Introduction:
Steel structure is usually to build workshop,office,warehouse,bridge,and other buildings,mainly adopt steel plate to cut and form H or T type,just for easy use.
1. Main steel:Q195,Q215,Q235,Q256,Q275,Q345,Q235,etc
2. Column&Beam:Welded or Hot roolled H-section.
3. Connection method of steel structure:welding connection or boilt connection.
4. Wall&Roof:EPS,Rockwool,PU sandwich,corrugated steel sheet.
5. Door:Rolled up door or sliding door.
6. Window:Plastic steel or Aluminum alloy window
7. Surface:Hot dip galvanized or painted,(More Ral Color as per request)
8. Crane:5MT,10MT,15MT,etc,.
Parameters:
Steel frame (beams and column) | Welded H steel ,Hot rolled steel |
Purlins | C section , Z section |
Brace for beams and columns | round steel , angle steel ,pipe |
Roof parts | sandwich panels ,galvanized sheets Thickness:50mm,75mm,100,/0.3mm-0.6mm |
Wall parts | sandwich panels ,galvanized sheets Thickness:50mm,75mm,100,/0.3mm-0.6mm |
Windows | PVC ,Aluminum (Slidding,Horizontal opening) |
Doors | Slidding , rolled up door |
Ground parts | Anchor bolts+cements+steel |
Accessories | coner , screws ,revits... |
Roof skylights | customised |
Ventilation fans | customised |
Drawings&Quation:
1. Customized design to welcome.
2. As long as you like, we can design and provide drawings for you.
3. In order to give yo an exactly quotation and drawings,pls tell us the ;Length,width,eave height and local weather. we'll quote for you asap.
Packing and shipping:
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) the lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) at the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) no rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) the member to the construction site, timely organization of unloading, stacking area.
(6) the crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.