
Add to Cart
Easy Installation Economic Movable Pre-engineered Industrial Steel Structure Workshop
Main Materials of Easy Installation Economic Movable Pre-engineered Industrial Steel Structure Workshop
Main Materials | |||
Main steel frame | Column | Q235, Q345 Welded H Section Steel | |
Beam | Q235, Q345 Welded H Section Steel | ||
Purlin | Q235 C and Z purlin | ||
Knee brace | Q235 Angle Steel | ||
Tie Rod | Q235 Circular Steel Pipe | ||
Brace | Q235 Round Bar | ||
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | ||
Roof Panel | Steel Plated, Sandwich Panel(EPS/PU/Firberglass/RockWool) | ||
Wall Panel | Steel Plated, Sandwich Panel(EPS/PU/Firberglass/RockWool) | ||
Accessories | Window | Plastic steel or Aluminum alloy window | |
Door | Rolling safety door or Sliding door | ||
Rainspout | PVC |
Our advantages:
1. Cost saving and transportation convenient, custom design available
2. The main beam and column are made of quality steel
3. Steel structure makes the house resist heavy wind of 220km/h and 8-grade earthquake
4. Easy assembly and disassembly several times without damage
5. Good environmental protection effect. Steel structure housing construction greatly reduces sand, stone and dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced
6. Production according welding rules a = 0.7(1.0) x thickness of web;
7. Continuous welding on both sides of each pieces;
8. Own the hot dip galvanize zinc pool ourself,pool size:12.5x1.6x2m(LXWXD);
9. Mark every beam on the bottom plate for being saw after being galvanized;
10. Send pictures to the buyer by mail during products being processed and loaded in container;
11. Near the Qingdao port,only need 1.5hour by car,the land transport cost cheaper;
12. Near the Qingdao International airport, only need 0.5hour by car, the client can visit us easily.
Packing Materials&Loading:
Packing materials:
Bottom steel rack
Cable wire
Timber
Packing straps
Wooden box
Carton box, etc.
Loading & unloading:
Use 2-3 forklifts to lift the package up and pushed slowly by the end forklift into the 40'GP/40'HC/40'OT containers. The unloading is the same.