Qingdao Ci'an Industrial Co., Ltd

QINGDAO CI'AN INDUSTRIAL CO., LTD

Manufacturer from China
Active Member
6 Years
Home / Products / Steel Structure Workshop /

Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation

Contact Now
Qingdao Ci'an Industrial Co., Ltd
City:qingdao
Province/State:shandong
Country/Region:china
Contact Person:MrsYan
Contact Now

Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation

Ask Latest Price
Brand Name :Homeshore
Model Number :CAYF-0016
Certification :ISO9001
Place of Origin :Qingdao China
MOQ :500 square meters
Price :Negotiation
Payment Terms :T/T, Western Union,
Supply Ability :10000 tons per week
Delivery Time :20-30 working days
Packaging Details :Standard sea transport package
Grade :Hot Rolled Steel
Standard :GB
Material :Q345 Low Carbon Steel
Surface Treatment :Hot Dip Galvanized or Painting
Steel Surface :Short Blasting than painting
Wind Load :≤35m/s
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Steel Structure Warehouse Building long Span Quick Installation with High Grade Wind Resistance

Specifications:


1) Main Steel: Q345, Q235, Q345B, Q235B etc.
2) Column & Beam: Welded or Hot rolled H-section
3) Connection method of steel structure: welding connection or bolt connection
4) Wall & Roof: EPS, Rockwool, PU sandwich, corrugated steel sheet
5) Door: Rolled up door or Sliding door
6) Window: Plastic steel or Aluminum alloy window
7) Surface: Hot dip galvanized or painted
8) Crane: 5MT, 10MT, 15MT and more

Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation

Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation

Parameters:

Items Specification
Main Steel Frame Column Q235, Q345 Welded H Section Steel
Beam Q235, Q345 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical&Horizontal support Q235 Angle Steel, Round Bar or Steel Pipe
Cladding system Roof panel EPS Sandwich Panel / Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
Wall panel same with roof panel
Accessories Window Aluminium Alloy Window / PVC Window
Door Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door
Rainspout PVC
Live load on Roof In 50kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade according to local climate
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Finishing Options Vast array of colors and type available
Paint Options Alkyd painting, two primary painting, two finish painting
(gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized.

Drawings & Quotation:

1. Various styles can be designed and manufactured according to your needs.

2. As long as you like, we can design and provide drawings for you.

3. In order to give yo an exactly quotation and drawings, pls tell us the : Length,width,eave height and local weather. Quotation will be sent asap.

Terms:

Payment : L/C or by T/T(30% prepaid as depsit, the balance 70% before shipment)

Delivery time : 15~40 days,usually as customers's order

Shipment : 20'GP, 40'GP,40'HQ, 40'OT or in bulk

Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation

Packing and shipping:

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) the lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) at the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) no rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) the member to the construction site, timely organization of unloading, stacking area.

(6) the crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation

Inquiry Cart 0