
Add to Cart
Environment Friendly Movable Steel Frame Painted Living Container Houses
The advantage of Environment Friendly Movable Steel Frame Painted Living Container Houses:
1, Easy to install manually, without welding and large machinery.
2. Strong skeleton can resist typhoon 11 grades
3. The elegant appearance of the atmosphere
4, Stable structure
5, Earthquake resistance 8 grades
6, Single combination, multiple combinations, single layer, double-layer combination, flexible layout.
7. The service life is over 10 years and recoverable
8. It can be disassembled many times, or can be hoisted directly.
About Us:
Qingdao Cian Industrial Co., Ltd was founded in the year of 2008. We are specialized in all kinds of ISO shipping containers,such as 20feet GP HQ,40feet GP HQ ,open top container,side door container,mini container,storage container,bulk container,accommodation container,fold-able container, office container,military container,half-height container,OT container houses design&production.
Since we are manufacture and have the full production line such as the stamping machines, cutting and bending machines,pretreatment devices,coating devices,automatic and semi-automatic welding machine,our price is much competitive. And our main advantage is we can design and manufacture different container houses according to client's requirements.Welcome to our factory ,we can show you more
Combination:
The number of houses can be increased or decreased at any time, and meeting rooms, dormitories, kitchens, bathrooms, etc. can be arbitrarily combined, and customized according to customer requirements
Parameters:
Measure | 6400*5910*2520mm | ||
Packing size | 2200*5910*2520mm | ||
Wall panel | 50/75mm EPS/Rock wool/PU sandwich panel with double-sided 0.4mm PPGI | ||
Steel structure | 2.5~3.0mm galvanized steel structure | ||
Windows | Plastic steel/Aluminum alloy single-layer hollow glass window with screens | ||
Entry door | Plastic steel/Aluminum alloy single-layer hollow glass door | ||
Subfloor | 18mm multi-plywood/cement-fibre board | ||
Bathroom floor | PVC floor/ceramic tile | ||
Bathroom | Shower,Seated Toilet,Wash Basin,Towel Rack+Mirror+Paper box | ||
Kitchen | Sink with Cupboard(PVC Panel),stainless steel double sink,tap | ||
Water pipe | PPR and PVC water supply and drainage pipe with fittings | ||
Electric system | Switch,socket,lamp light,waterproof socket,distribution box. | ||
Accessories | Paint,glass cement,floor nail,blind rivets etc. |
Application:
Construction site. Office building.
Woker living house. School. Canteen. Recreation room.
Washing room,Laundry room,Chicken farm.warehouse.
Outdoor temporary Dormitory. Lobby. Office. Bathroom.
Installation/Loading Time:
Each worker can assemble 20-30 square meters every day.
6 worker can finish 300sqm prefab house in 2 days.
Loading: 320 square meters can be loaded in one 40 feet shipping(used 50mm wall panel,20mm roof tile)